BOHS P402 surveyors · UKAS-accredited lab analysis · Survey reports in 24 to 48 hoursCall 0151 000 0000
MerseylineAsbestos Removal

Surveys

Asbestos refurbishment and demolition survey in Liverpool

Before any building work, a refurbishment and demolition survey finds asbestos in the areas that will be disturbed. It is more intrusive than a management survey and is needed before work starts.

Two operatives in white coveralls putting up hazard tape in front of an empty school building

Builders, developers and homeowners in Liverpool are asked for this survey before knocking walls through, stripping ceilings, replacing roofs or demolishing garages. It is intrusive: the surveyor opens up voids and samples materials inside the work area.

The area is usually empty or sealed during the survey. The report tells the contractor exactly what must be removed first, so removal, new roof and the main build can be planned in the right order.

How the job runs

  1. 1

    Define the work area

    You tell us what will be altered or demolished.

  2. 2

    Intrusive inspection

    The surveyor opens voids and samples materials in that area.

  3. 3

    Laboratory analysis

    UKAS-accredited laboratory analysis.

  4. 4

    Report and removal plan

    A written report, and an introduction to a removal contractor if asbestos is found.

What affects the price

  • Size of the work area
  • Number of rooms or elevations
  • Hidden voids and roof spaces
  • Whether the building is empty
  • Number of samples

Common questions

Do I need this for a garage demolition?

Yes, an asbestos survey of the garage is needed first, because the roof and cladding often contain asbestos.

Can the same company remove it?

We introduce you to an independent removal contractor after the survey, with no obligation.

Get a quote
Call nowGet a quote